Compliance & Regulations
Quality Assurance & Quality Control (QA/QC) Compliance & Regulations β A 360Β° Approach
Ensuring Regulatory Adherence, Contractual Compliance, and Industry Standards in Mega Construction Projects
1. Introduction
The Quality Assurance & Quality Control (QA/QC) Department at BEC Arabia is responsible for ensuring that all construction activities comply with:
β Saudi Building Code (SBC) & Municipality Regulations β Saudi Contractors Authority (SCA) & Public Investment Fund (PIF) Mega Project Requirements (NEOM, Red Sea, Qiddiya, NUPP, etc.) β FIDIC & NEC Contractual Standards for Quality Control β ISO 9001 (Quality), ISO 45001 (HSE), and ISO 14001 (Environmental Compliance) β Royal Commission, Aramco, and Government Regulatory Approvals
The 360Β° compliance framework ensures full alignment between quality policies, contractual obligations, and regulatory standards, reducing legal risks, avoiding penalties, and ensuring project excellence.
2. Regulatory Compliance Framework & Governance
2.1 QA/QC Regulatory Compliance Governance
Compliance Level
Responsible Stakeholders
Key Oversight Areas
Executive Oversight
CEO, QA/QC Director, Risk Management Team
Strategic compliance enforcement & risk mitigation
Project-Level QA/QC Compliance
QA/QC Managers, Engineers, Inspectors
Site quality control, inspections, material compliance
Regulatory & Municipality Compliance
Regulatory Affairs, HSE, Auditors
SBC, environmental, safety, and permitting approvals
Procurement & Supplier Compliance
Procurement Team, Suppliers, Vendors
Material compliance, technical approvals, testing
π Benchmark: All compliance-related activities must be documented and auditable for 100% regulatory adherence.
3. Saudi Building Code (SBC) & Municipality Compliance
3.1 SBC & Municipality Approval Processes
β All project designs, construction methods, and materials must comply with SBC regulations. β Structural safety, fire protection, seismic resistance, and energy efficiency must meet SBC codes. β All municipality permits and approvals must be secured before construction begins.
π Compliance Checkpoints:
SBC Compliance Reports & Municipality Inspections
Seismic & Fire Safety Approvals
Utility & Infrastructure Compliance (Water, Electricity, Roads, etc.)
π Benchmark: Zero non-compliance findings during municipal inspections.
4. FIDIC & NEC Contractual Compliance for Quality Control
4.1 Engineering & Construction Quality Compliance Under FIDIC Contracts
β All QA/QC activities must align with FIDIC and NEC contract terms for quality control. β Change orders and variations must be formally documented and approved. β Defective work must be rectified at the contractorβs expense under FIDIC liability provisions.
π Key Risks & Compliance Areas: β Failure to meet contractual quality specifications. β Design changes causing cost and schedule impacts. β Legal disputes arising from rejected works or defective materials.
β Mitigation Measures: Implement structured quality control approval workflows and legal compliance tracking.
π Benchmark: Zero contractual disputes related to quality compliance.
5. ISO 9001, ISO 45001, & ISO 14001 Compliance
5.1 Quality Management (ISO 9001) Compliance
β All quality management systems must follow ISO 9001 standards. β QA/QC documentation, audits, and reporting must be maintained per ISO requirements. β Corrective & preventive action (CAPA) processes must be implemented for defects.
π Deliverables:
ISO 9001 Audit Reports
Non-Conformance Report (NCR) Logs
Supplier & Material Compliance Certification
π Benchmark: Zero major non-conformances in ISO audits.
5.2 Environmental Compliance (ISO 14001) & Sustainability Standards
β Construction waste management plans must align with ISO 14001 environmental regulations. β Energy efficiency, pollution control, and sustainable building practices must be enforced. β LEED compliance must be integrated for green building certification.
π Key Compliance Areas:
Construction Waste Reduction & Recycling Reports
Environmental Impact Assessments (EIA)
Energy Efficiency & Carbon Footprint Audits
π Benchmark: 100% compliance with Saudi Environmental Regulations & ISO 14001.
5.3 Health & Safety Compliance (ISO 45001)
β All quality inspections must align with ISO 45001 occupational health & safety standards. β Permit-to-Work (PTW) procedures must be enforced for high-risk construction activities. β All safety violations must be immediately reported and corrective actions implemented.
π Key Compliance Documents:
Site Safety Inspection & HSE Reports
Incident Reports & Corrective Action Logs
ISO 45001 Safety Compliance Checklists
π Benchmark: Zero lost-time injuries (LTI) due to quality-related safety failures.
6. Material & Supplier Compliance
6.1 Material Testing & Certification Requirements
β All materials must meet project specifications and pass third-party testing. β Factory acceptance tests (FAT) must be conducted before procurement approvals. β All suppliers must be pre-qualified and assessed for quality risk.
π Compliance Deliverables:
Material Compliance Certification Logs
Third-Party Testing & Verification Reports
Supplier Quality Compliance Audit Results
π Benchmark: 100% of materials must be verified and tested before site use.
7. Digital Quality Compliance Monitoring & Reporting
7.1 Digital Compliance & Quality Assurance Tools
Technology
Functionality
Application in QA/QC Compliance
Aconex (EDMS)
Document Control, Non-Conformance Reports (NCR)
Ensures regulatory compliance & quality records management
BIM 360
3D Model Integration, Clash Detection
Reduces errors & enhances compliance verification
SAP ERP
Procurement Integration, Material Approval
Ensures supplier compliance & technical submittal tracking
Primavera P6
Construction Schedule Risk Analysis
Monitors quality impact on project timeline
Power BI Dashboards
Real-Time Compliance Analytics
Tracks quality audits, NCR closure rates, and approvals
π Benchmark: 100% digital tracking of quality compliance & regulatory approvals.
8. Compliance Audits & Risk Control
8.1 Internal & External Quality Compliance Audits
β Monthly internal quality audits must be conducted. β Annual third-party audits must verify ISO, SBC, and contractual compliance. β All audit findings must result in corrective action implementation.
π Compliance Tracking Reports:
Internal & External Audit Compliance Reports
Non-Conformance Closure Reports & Trend Analysis
Regulatory Inspection & Certification Reports
π Benchmark: Zero non-conformities in compliance audits.
9. Key Compliance & Performance Indicators (KPIs)
KPI Name
Definition
Target Benchmark
Regulatory Compliance Rate (%)
% of regulatory approvals obtained without rejections
β₯ 98%
Material Compliance Rate (%)
% of materials approved without quality deviations
β₯ 99%
Audit Pass Rate (%)
% of successful internal & external audits
β₯ 95%
Non-Conformance Closure Time (Days)
Average time taken to resolve NCRs
β€ 7 Days
π Benchmark: All regulatory KPIs must be tracked & reported monthly.
10. Conclusion
The QA/QC Compliance & Regulations Framework at BEC Arabia ensures: β Full adherence to SBC, ISO, FIDIC, and municipality quality standards. β Regulatory risk control through structured approvals & compliance audits. β Quality-driven construction practices to eliminate rework & defects. β Digital tracking for real-time quality assurance & compliance verification.
By embedding compliance protocols into quality management workflows, BEC Arabia guarantees defect-free, legally compliant, and high-quality project execution.