Page cover

Quality Assurance & Quality Control

Quality Assurance & Quality Control (QA/QC) Department

Ensuring Excellence, Compliance, and Precision in Mega Construction Projects


1. Introduction

The Quality Assurance & Quality Control (QA/QC) Department at BEC Arabia plays a critical role in maintaining construction quality standards, regulatory compliance, and project excellence. By implementing structured quality management processes, QA/QC ensures:

βœ… Adherence to contract specifications, Saudi Building Code (SBC), and international standards (ISO 9001, ISO 14001, ISO 45001). βœ… Proactive quality planning, inspection, and testing across all project phases. βœ… Elimination of defects, rework reduction, and process improvement through preventive actions. βœ… Compliance with FIDIC, NEC, and local authority regulations for quality control. βœ… Continuous monitoring and improvement of construction quality through audits, reporting, and corrective actions.

With a 360Β° approach to quality assurance and control, BEC Arabia guarantees that all projects meet client expectations, regulatory mandates, and performance benchmarks.


2. QA/QC Department Responsibilities & Scope

The QA/QC Department functions as an independent entity that oversees and verifies construction quality, ensuring compliance with contractual, regulatory, and safety standards.

2.1 Key Responsibilities

QA/QC Function

Key Responsibilities

Integration with Other Departments

Quality Assurance (QA)

Develops quality policies, plans, and procedures

Collaborates with Engineering, Procurement, & HSE

Quality Control (QC)

Conducts inspections, testing, and compliance audits

Works with Site Teams, Contractors, & Consultants

Non-Conformance Management

Identifies, reports, and resolves quality issues

Coordinates with Construction & Engineering

Material & Equipment Verification

Ensures compliance with technical specifications

Works with Procurement & Logistics

Regulatory & ISO Compliance

Implements ISO 9001, SBC, and contractual quality standards

Engages with Regulatory Bodies & Clients

πŸ“Œ Benchmark: All quality processes must be documented, monitored, and continuously improved.


3. Quality Management Framework & Governance

3.1 QA/QC Organizational Structure

Role

Responsibilities

QA/QC Director

Defines quality policies & ensures compliance with ISO & regulatory standards.

Quality Assurance Manager

Develops & enforces QA plans, training programs, and documentation controls.

Quality Control Manager

Oversees QC inspections, testing, and site compliance monitoring.

QA/QC Engineers & Inspectors

Conducts field inspections, audits, and material testing.

Document Control & Compliance

Manages records, non-conformance reports (NCRs), and approval processes.

πŸ“Œ Benchmark: QA/QC must operate independently from construction teams to maintain unbiased quality enforcement.


4. Quality Assurance (QA) Policies & Standards

4.1 Quality Planning & Policy Implementation

βœ… All projects must have a Quality Management Plan (QMP) approved before execution. βœ… Quality standards must align with ISO 9001, FIDIC, NEC, and SBC regulations. βœ… Contractual obligations must be integrated into the QA framework.

πŸ“Œ Deliverables:

  • Project-Specific Quality Management Plans (QMP).

  • Inspection & Test Plans (ITP) for all construction activities.

  • Continuous training & quality awareness programs.

πŸ“Œ Benchmark: 100% of projects must follow approved QA plans.


5. Quality Control (QC) Procedures & Inspection Framework

5.1 QC Inspections & Testing Requirements

βœ… Site inspections must be conducted as per the Inspection Test Plan (ITP). βœ… Material & equipment must be tested for compliance before installation. βœ… All test results must be documented in quality reports.

πŸ“Œ Types of QC Inspections:

  • Incoming Material Inspections – Ensures raw materials meet specifications.

  • Process Inspections – Monitors work in progress for compliance.

  • Final Inspections & Handover – Verifies completed works before acceptance.

πŸ“Œ Benchmark: β‰₯ 98% defect-free project completion rate.


6. Non-Conformance Management & Corrective Actions

6.1 Non-Conformance Reporting (NCR) Policy

βœ… All quality deviations must be documented in an NCR. βœ… NCRs must be resolved within a defined corrective action timeframe. βœ… Root Cause Analysis (RCA) must be conducted for recurring NCRs.

πŸ“Œ Resolution Process:

  • NCR Issued β†’ Contractor Notified β†’ Corrective Action Plan (CAP) Implemented β†’ Final Inspection & Closure

πŸ“Œ Benchmark: 90% of NCRs must be closed within the agreed timeframe.


7. Material & Equipment Verification Process

7.1 Material Testing & Compliance Checks

βœ… All materials must have technical approvals before procurement. βœ… Materials must pass factory acceptance testing (FAT) & third-party lab verification. βœ… Supplier audits must be conducted for high-risk materials.

πŸ“Œ Benchmark: 100% material compliance verification before site use.


8. Regulatory Compliance & ISO Standards

8.1 Compliance with Saudi Building Code (SBC) & ISO Standards

βœ… All quality procedures must align with SBC, ISO 9001, ISO 45001, and ISO 14001. βœ… Municipality & authority approvals must be secured for compliance. βœ… QA/QC reports must be available for regulatory audits.

πŸ“Œ Benchmark: Zero regulatory violations or non-compliance penalties.


9. Quality Audit & Continuous Improvement

9.1 Internal & External Quality Audits

βœ… Monthly internal quality audits must be conducted. βœ… Annual third-party audits must verify ISO compliance. βœ… All audit findings must result in corrective action implementation.

πŸ“Œ Benchmark: 100% audit compliance with no major findings.


10. Digital QA/QC Monitoring & Reporting

10.1 Digital Tools for Quality Tracking

Technology

Functionality

Application in QA/QC

Aconex (EDMS)

Document Control, NCR Tracking

Ensures quality compliance & documentation management

BIM 360

3D Model Integration, Clash Detection

Ensures design quality before execution

SAP ERP

Procurement Integration, Material Approval

Verifies supplier compliance with specifications

Power BI Dashboards

Quality KPI Monitoring

Tracks approval timelines, NCR closure rates

πŸ“Œ Benchmark: 100% digital quality tracking for transparency & audit readiness.


11. Key Performance Indicators (KPIs) & Quality Metrics

KPI Name

Definition

Target Benchmark

Defect Rate (%)

% of defects identified per project phase

≀ 2%

NCR Closure Rate (%)

% of NCRs resolved within the deadline

β‰₯ 95%

Material Compliance Rate (%)

% of materials approved without rejection

β‰₯ 98%

Regulatory Compliance Score (%)

% compliance with SBC, ISO, and contract terms

β‰₯ 99%

πŸ“Œ Benchmark: All QA/QC KPIs must be tracked & reported monthly.


12. Conclusion

The QA/QC Department at BEC Arabia ensures: βœ… Robust quality assurance frameworks for compliance with ISO, SBC, and FIDIC. βœ… Proactive inspections, testing, and defect prevention strategies. βœ… Full compliance with regulatory and contractual quality standards. βœ… Continuous improvement through digital tracking, audits, and performance monitoring.

By embedding a structured quality management system, BEC Arabia guarantees defect-free, high-quality construction projects that meet and exceed client expectations.

Last updated

Was this helpful?