Risk Management
Engineering Department Risk Management – A 360° Approach
Proactive Risk Identification, Mitigation, and Compliance for Mega Construction Projects at BEC Arabia
1. Introduction
The Engineering Department at BEC Arabia plays a critical role in risk management by ensuring design accuracy, compliance, and constructability. Engineering risks can lead to cost overruns, schedule delays, rework, and regulatory violations, making structured risk management essential.
A 360° risk management framework integrates: ✅ Risk Identification & Classification – Detecting risks early in the project lifecycle. ✅ Risk Analysis & Mitigation Strategies – Preventing cost, schedule, and compliance failures. ✅ Technical Coordination & Regulatory Risk Control – Ensuring alignment with SBC, FIDIC, and ISO standards. ✅ Digital Monitoring & Reporting – Tracking risks using Aconex, Primavera P6, SAP ERP, and Power BI dashboards.
This proactive approach minimizes engineering errors, contractual disputes, and project disruptions, ensuring seamless project execution.
2. Engineering Risk Governance & Responsibility Matrix
2.1 Engineering Risk Management Structure
Risk Level
Stakeholders Responsible
Key Risk Oversight Areas
Strategic Risks
CEO, Directors, Risk Management Team
Compliance, Legal, Financial Risks
Technical & Execution Risks
Engineering Managers, Consultants
Design Quality, Constructability, Execution Feasibility
Regulatory & Compliance Risks
Regulatory Affairs, QA/QC, HSE Teams
Saudi Building Code (SBC), Permits, Safety Regulations
Project-Level Risks
Site Engineers, Technical Office, Document Controllers
RFI Resolution, Change Management, Construction Support
📌 Benchmark: All high-impact engineering risks must be reported within 24 hours and addressed within 72 hours.
3. Risk Identification & Classification in Engineering
3.1 Key Risk Categories in Engineering
Risk Type
Potential Threats
Impact Area
Mitigation Strategies
Design Risks
Errors in drawings, late approvals, incorrect assumptions
Cost, Rework, Schedule
Multi-tiered design review, BIM clash detection
Regulatory Risks
Non-compliance with SBC, municipality permit issues
Compliance, Legal
Pre-approval processes, regulatory audits
Schedule Risks
Delays in engineering deliverables, late RFI responses
Project Timeline
Primavera P6 tracking, milestone approvals
Technical Coordination Risks
MEP/Structural/Architectural clashes, RFI bottlenecks
Rework, Cost Overruns
BIM 360 integration, weekly technical meetings
HSE Risks
Failure to follow safety codes, engineering miscalculations
Site Safety, Legal
ISO 45001 compliance, safety inspections
Procurement Risks
Delayed material approvals, non-compliant materials
Construction Delays
SAP ERP integration, lead time analysis
📌 Benchmark: All engineering risks must be categorized by severity and probability, with documented mitigation plans.
4. Risk Analysis & Mitigation Strategies
4.1 Risk Probability & Impact Analysis
BEC Arabia follows qualitative & quantitative risk analysis methods to assess engineering risks.
🔹 Probability-Impact Matrix (PIM): Categorizes risks into Low, Medium, High, and Critical based on financial and schedule impact. 🔹 Monte Carlo Simulations: Forecasts the probability of cost & schedule overruns based on historical project data. 🔹 Failure Mode & Effect Analysis (FMEA): Used to assess technical risks in engineering & construction execution.
📌 Benchmark: All high-impact risks (>10% budget/schedule impact) require executive-level review & mitigation approval.
4.2 Engineering Risk Response Strategies
Mitigation Type
Strategy
Application in Engineering
Avoidance
Prevent risk occurrence
Conduct early feasibility & clash detection
Reduction
Minimize risk impact
Use BIM 360 for real-time design coordination
Transfer
Shift risk responsibility
Use contractual clauses for design liabilities
Acceptance
Plan for risk occurrence
Allocate contingency budget & time buffers
📌 Benchmark: 80% of risks must be addressed through preventive strategies, reducing last-minute emergency responses.
5. Regulatory & Compliance Risk Control
5.1 Compliance with Saudi Building Code (SBC) & Municipality Requirements
✅ All engineering designs must pass regulatory audits before execution. ✅ Permit risks must be identified early to prevent project shutdowns. ✅ Environmental Impact Assessments (EIA) must be integrated into design reviews.
📌 Key Compliance Risks: ❌ Unapproved designs leading to regulatory penalties ❌ Failure to secure permits causing construction delays ❌ Non-compliance with seismic or fire safety codes
✅ Mitigation: Pre-approval checklists, compliance tracking in Aconex.
📌 Benchmark: 100% regulatory compliance with zero permit-related delays.
5.2 FIDIC & NEC Contractual Risk Mitigation
✅ All engineering deliverables must follow contract-defined timelines. ✅ Changes to IFC drawings must be formally documented through Change Order Requests (COR). ✅ Dispute resolution mechanisms must be implemented for technical claim management.
📌 Key Contractual Risks: ❌ Failure to meet contractual engineering deliverables ❌ Design changes leading to cost overruns and legal disputes ❌ Delays in RFI responses affecting subcontractor performance
✅ Mitigation: Digital contract compliance tracking, dispute resolution protocols.
📌 Benchmark: Zero contractual disputes related to engineering deliverables.
6. Digital Risk Monitoring & Control
6.1 Engineering Risk Tracking & Automation
Technology
Functionality
Risk Control Area
Aconex (EDMS)
Document Control, RFI Tracking
Prevents design errors & RFI delays
BIM 360
Clash Detection, Model Coordination
Reduces rework & constructability risks
SAP ERP
Material Compliance, Procurement Risk
Prevents delays in approvals & supply chain
Primavera P6
Engineering Schedule Risk Analysis
Ensures on-time deliverables & critical path tracking
Power BI Dashboards
Real-Time Risk Analytics
Tracks engineering KPIs & risk exposure
📌 Benchmark: All engineering risks must be monitored in real-time for early intervention.
7. Engineering Risk-Based KPI Performance Monitoring
KPI Name
Definition
Target Benchmark
Risk Mitigation Success Rate (%)
% of identified risks successfully mitigated
≥ 85%
Risk Impact on Cost Variance (%)
Variance between risk-adjusted & forecasted costs
≤ 3%
NCR (Non-Conformance Report) Closure Rate (%)
% of NCRs closed within agreed timeframe
≥ 95%
Engineering Delay Risk Impact (%)
Delays caused by unresolved engineering issues
≤ 5%
📌 Benchmark: All high-impact risk incidents must be closed within 30 days of identification.
8. Conclusion
The 360° Engineering Risk Management Framework at BEC Arabia ensures: ✅ Proactive risk identification & digital tracking for construction projects. ✅ Integration of risk control measures with engineering, contracts, and compliance teams. ✅ Minimized impact of design errors, regulatory non-compliance, and execution risks. ✅ Data-driven decision-making using real-time risk analytics & AI-based forecasting tools.
By embedding structured risk mitigation strategies into engineering workflows, BEC Arabia enhances project resilience, prevents financial losses, and ensures compliance with global and local standards.