Risk Management

Engineering Department Risk Management – A 360° Approach

Proactive Risk Identification, Mitigation, and Compliance for Mega Construction Projects at BEC Arabia


1. Introduction

The Engineering Department at BEC Arabia plays a critical role in risk management by ensuring design accuracy, compliance, and constructability. Engineering risks can lead to cost overruns, schedule delays, rework, and regulatory violations, making structured risk management essential.

A 360° risk management framework integrates: ✅ Risk Identification & Classification – Detecting risks early in the project lifecycle. ✅ Risk Analysis & Mitigation Strategies – Preventing cost, schedule, and compliance failures. ✅ Technical Coordination & Regulatory Risk Control – Ensuring alignment with SBC, FIDIC, and ISO standards. ✅ Digital Monitoring & Reporting – Tracking risks using Aconex, Primavera P6, SAP ERP, and Power BI dashboards.

This proactive approach minimizes engineering errors, contractual disputes, and project disruptions, ensuring seamless project execution.


2. Engineering Risk Governance & Responsibility Matrix

2.1 Engineering Risk Management Structure

Risk Level

Stakeholders Responsible

Key Risk Oversight Areas

Strategic Risks

CEO, Directors, Risk Management Team

Compliance, Legal, Financial Risks

Technical & Execution Risks

Engineering Managers, Consultants

Design Quality, Constructability, Execution Feasibility

Regulatory & Compliance Risks

Regulatory Affairs, QA/QC, HSE Teams

Saudi Building Code (SBC), Permits, Safety Regulations

Project-Level Risks

Site Engineers, Technical Office, Document Controllers

RFI Resolution, Change Management, Construction Support

📌 Benchmark: All high-impact engineering risks must be reported within 24 hours and addressed within 72 hours.


3. Risk Identification & Classification in Engineering

3.1 Key Risk Categories in Engineering

Risk Type

Potential Threats

Impact Area

Mitigation Strategies

Design Risks

Errors in drawings, late approvals, incorrect assumptions

Cost, Rework, Schedule

Multi-tiered design review, BIM clash detection

Regulatory Risks

Non-compliance with SBC, municipality permit issues

Compliance, Legal

Pre-approval processes, regulatory audits

Schedule Risks

Delays in engineering deliverables, late RFI responses

Project Timeline

Primavera P6 tracking, milestone approvals

Technical Coordination Risks

MEP/Structural/Architectural clashes, RFI bottlenecks

Rework, Cost Overruns

BIM 360 integration, weekly technical meetings

HSE Risks

Failure to follow safety codes, engineering miscalculations

Site Safety, Legal

ISO 45001 compliance, safety inspections

Procurement Risks

Delayed material approvals, non-compliant materials

Construction Delays

SAP ERP integration, lead time analysis

📌 Benchmark: All engineering risks must be categorized by severity and probability, with documented mitigation plans.


4. Risk Analysis & Mitigation Strategies

4.1 Risk Probability & Impact Analysis

BEC Arabia follows qualitative & quantitative risk analysis methods to assess engineering risks.

🔹 Probability-Impact Matrix (PIM): Categorizes risks into Low, Medium, High, and Critical based on financial and schedule impact. 🔹 Monte Carlo Simulations: Forecasts the probability of cost & schedule overruns based on historical project data. 🔹 Failure Mode & Effect Analysis (FMEA): Used to assess technical risks in engineering & construction execution.

📌 Benchmark: All high-impact risks (>10% budget/schedule impact) require executive-level review & mitigation approval.


4.2 Engineering Risk Response Strategies

Mitigation Type

Strategy

Application in Engineering

Avoidance

Prevent risk occurrence

Conduct early feasibility & clash detection

Reduction

Minimize risk impact

Use BIM 360 for real-time design coordination

Transfer

Shift risk responsibility

Use contractual clauses for design liabilities

Acceptance

Plan for risk occurrence

Allocate contingency budget & time buffers

📌 Benchmark: 80% of risks must be addressed through preventive strategies, reducing last-minute emergency responses.


5. Regulatory & Compliance Risk Control

5.1 Compliance with Saudi Building Code (SBC) & Municipality Requirements

All engineering designs must pass regulatory audits before execution.Permit risks must be identified early to prevent project shutdowns.Environmental Impact Assessments (EIA) must be integrated into design reviews.

📌 Key Compliance Risks:Unapproved designs leading to regulatory penaltiesFailure to secure permits causing construction delaysNon-compliance with seismic or fire safety codes

Mitigation: Pre-approval checklists, compliance tracking in Aconex.

📌 Benchmark: 100% regulatory compliance with zero permit-related delays.


5.2 FIDIC & NEC Contractual Risk Mitigation

All engineering deliverables must follow contract-defined timelines.Changes to IFC drawings must be formally documented through Change Order Requests (COR).Dispute resolution mechanisms must be implemented for technical claim management.

📌 Key Contractual Risks:Failure to meet contractual engineering deliverablesDesign changes leading to cost overruns and legal disputesDelays in RFI responses affecting subcontractor performance

Mitigation: Digital contract compliance tracking, dispute resolution protocols.

📌 Benchmark: Zero contractual disputes related to engineering deliverables.


6. Digital Risk Monitoring & Control

6.1 Engineering Risk Tracking & Automation

Technology

Functionality

Risk Control Area

Aconex (EDMS)

Document Control, RFI Tracking

Prevents design errors & RFI delays

BIM 360

Clash Detection, Model Coordination

Reduces rework & constructability risks

SAP ERP

Material Compliance, Procurement Risk

Prevents delays in approvals & supply chain

Primavera P6

Engineering Schedule Risk Analysis

Ensures on-time deliverables & critical path tracking

Power BI Dashboards

Real-Time Risk Analytics

Tracks engineering KPIs & risk exposure

📌 Benchmark: All engineering risks must be monitored in real-time for early intervention.


7. Engineering Risk-Based KPI Performance Monitoring

KPI Name

Definition

Target Benchmark

Risk Mitigation Success Rate (%)

% of identified risks successfully mitigated

≥ 85%

Risk Impact on Cost Variance (%)

Variance between risk-adjusted & forecasted costs

≤ 3%

NCR (Non-Conformance Report) Closure Rate (%)

% of NCRs closed within agreed timeframe

≥ 95%

Engineering Delay Risk Impact (%)

Delays caused by unresolved engineering issues

≤ 5%

📌 Benchmark: All high-impact risk incidents must be closed within 30 days of identification.


8. Conclusion

The 360° Engineering Risk Management Framework at BEC Arabia ensures: ✅ Proactive risk identification & digital tracking for construction projects.Integration of risk control measures with engineering, contracts, and compliance teams.Minimized impact of design errors, regulatory non-compliance, and execution risks.Data-driven decision-making using real-time risk analytics & AI-based forecasting tools.

By embedding structured risk mitigation strategies into engineering workflows, BEC Arabia enhances project resilience, prevents financial losses, and ensures compliance with global and local standards.